June 24, 2008 12:50 pm
—
Construction continues on the bridge at state highway 48 five miles south of Allen. The construction began June 16 and is expected to continue through mid-September. The detour route is along US Highway 75 between Calvin and Coalgate.
Copyright © 1999-2008 cnhi, inc.